Describe how each room will be used
Walk through a typical day with the household. In a kitchen, note task areas, appliance positions, counter use and whether more than one person works there. In a study, record desk orientation, screens, printer, video calls and charging habits. In a bedroom, consider bedside reading, storage, cleaning and night-time movement. This gives the designer usable context instead of a bare count of points.
Start with a marked architectural plan and room schedule. Add furniture, fixed cabinetry, doors, windows, mirrors, appliances and accessibility needs. Mark preferred switch and control locations based on how people enter and use the room. Label preferences separately from must-haves so the electrical designer can identify conflicts, safety constraints and coordination changes before work begins.
Do not draw circuit wiring or select technical ratings yourself. The Central Electricity Authority’s safety regulations require electrical supply lines and apparatus to be appropriately rated and safely installed and maintained; exact technical decisions belong to the responsible electrical professional under applicable requirements. Keep homeowner input at the level of use, equipment, location and preference.
Collect details for equipment that is already selected, such as model sheets and installation notes. If a product is undecided, label it provisional and avoid inventing an electrical load. That distinction gives the designer a clear list of confirmed inputs and decisions still due.
Create a schedule the designer can resolve
List known fixed appliances by room and include manufacturer, model or current product sheet when available. Record expected equipment that may be selected later, but label it “allowance to confirm.” Include water heaters, pumps, kitchen appliances, air-conditioning, backup power, entertainment, home office and outdoor equipment where relevant. Tell the designer which items are owner-supplied and who coordinates installation.
For lighting, describe the activity and desired feel: focused work, reading, general ambient light, display, cleaning or a low-level night route. Note daylight and glare concerns based on room use, but let the designer assess layouts, controls and applicable criteria. The Bureau of Energy Efficiency’s residential guidance links building design with daylight and energy efficiency; it is background, not a substitute for room-specific design.
| Room | Homeowner brief | Designer response |
|---|---|---|
| Kitchen | Appliances, counter tasks, cleaning | Locations and task-light plan |
| Living / dining | Seating, media, entertaining, scenes | Controls, glare review and points |
| Bedrooms | Bedside use, wardrobe, night route | Accessible controls and arrangement |
| Study | Desk, screens, calls, charging | Data, power and comfort coordination |
| Bathrooms | Mirror, grooming, ventilation | Wet-area and location coordination |
| Entry / outdoors | Security, arrival, cleaning | Exposure and control coordination |
Use the table as a conversation starter. A final schedule should refer to the drawing revision, room name and product assumptions so that a change in one room does not silently alter another. Ask the designer to flag any unresolved interfaces before a contractor begins concealed work.
Review light positions and controls on the plan
Review each proposed light in relation to furniture, cabinetry, fans, beams, doors, mirrors and artwork. Ask the designer to show task lighting where work happens and consider glare, shadows and maintenance access. A centered ceiling point may not serve a desk or counter. Request a schedule naming each fitting type, purpose, control and agreed dimming or scene intent.
Check controls from the user’s viewpoint: at room entry, near the bed, at a stair landing or where the household approaches a task. Multi-way controls or smart-home features need coordination between designer, installer and system supplier. Ask how manual operation works if a network or app is unavailable, and who will configure and support the system. Do not decide compatibility from a sales description alone.
Coordinate electrical points with cabinetry and finishes before walls close. Confirm locations against elevations for kitchens, TV walls, study desks, mirrors and wardrobes. Resolve concealed routes, access and wall changes with the qualified designer; never direct a worker to cut a structural element or move a point without approval. Keep a dated revision so site teams can distinguish current locations from superseded ideas.
For outdoor locations, give the designer the intended use and exposure conditions and ask what products and installation details are suitable. Keep the choice within professional review; weather exposure and physical access affect the specification. If a future provision is desired, identify its purpose and location rather than asking a contractor to leave an unlabelled loose wire.
Ask for qualified installation and useful handover records
Confirm who is responsible for design, installation, supervision and inspection, and what authorization applies to the work under relevant rules. Agree how changes are approved and hidden routes documented. Homeowners should not open panels, test live circuits or undertake installation tasks. If you see exposed or damaged wiring, water near electrical equipment, overheating, sparks or a burning smell, keep clear and contact the responsible professional or emergency service as appropriate.
Ask the team to explain commissioning and verification records, including scope and outcomes of required tests. Request updated drawings, circuit and equipment schedules, panel directory, product manuals, warranties, as-built documents, smart-control setup information and fault contacts. CEA regulations describe safety obligations for electrical apparatus; records should be managed by qualified people and reflect completed work.
Worked example: a family adds a second refrigerator and workstation after design review. Update the room schedule with exact product details and location, mark the revised plan and ask the electrical designer to assess the change. Record the approved response before the installer changes the design. At handover, compare the as-built schedule and panel labels with the approved revision. The homeowner clarified use without attempting technical design.
This brief is organizational guidance, not an electrical design or legal checklist. Current CEA regulations, applicable standards, local conditions and project requirements must be applied by qualified professionals. Keep dated copies of every revision and ensure superseded plans are clearly marked so they do not return to site by mistake.
Take this to your next meeting
Your site checklist
- Mark furniture, fixed cabinetry and daily activities by room.
- List known appliance models and label future assumptions.
- Describe lighting tasks, comfort preferences and control habits.
- Review point locations against elevations and furniture.
- Route technical design and changes through qualified professionals.
- Collect approved drawings, verification records and as-built schedules.
Common questions
Can I specify the number of sockets for each room?
Describe how the household uses the room and mark preferred locations. Ask the electrical designer to determine final provision and technical arrangement against equipment, requirements and plans.
Should every light be a downlight?
No single fitting type suits every task. Ask for a room-specific plan considering work, reading, ambience, glare, maintenance and controls.
What electrical records should I keep?
Request final drawings, as-built information, equipment and circuit schedules, panel directory, required verification records, manuals, warranties and system setup instructions.
Reading notes
Sources & further reading
Checked on the dates below. Official requirements and documents can change; confirm the version that applies to your site.
- CEA Safety and Electric Supply Regulations, 2023: Gazette notification (government-hosted copy) Accessed 10 November 2026
- Bureau of Energy Efficiency: Eco Niwas Samhita Accessed 10 November 2026
- BIS: National Building Code of India overview Accessed 10 November 2026

