Map what the roof already has to do
Begin with a simple plan or annotated photograph. Mark the stair head, water tanks, solar water heater if present, drains, parapets, clothes-drying area, satellite equipment, service doors and the route someone uses to reach them. Record possible relocations as questions for the project team, rather than agreed changes. Do not call the remaining shape “usable area” yet: access, shade, structure, drainage and servicing can change the answer.
Use existing drawings, photographs and observations from safely accessible places. Arrange suitably equipped professionals for rooftop access and measurements. Record roof levels and surfaces, but avoid relying on a visual guess about load capacity or attachment points. A roof map is a coordination document, not an installation design. Ask the eventual professionals to identify the areas they need to inspect and the information they need from the house drawings.
Compare roof zones by conflict, not just sunlight
Sun exposure matters, but a roof zone also has a future maintenance job. Use a two-column conversation starter like this when reviewing a roof with your design and solar teams:
| Roof zone | Questions and possible conflicts to resolve |
|---|---|
| Open, sun-exposed area | Is the roof surface in good condition? Can it remain reachable for inspection, cleaning and repairs without moving household equipment? |
| Shade-prone or changing-shade area | What creates shade across the day and across seasons: a tree, neighbouring building, parapet, tank or future addition? Has the team observed rather than assumed it? |
| Tank, stair-head or service zone | Will equipment obstruct access, drainage checks or replacement of the tank, pump or other service? Which route remains clear? |
| Access and maintenance path | Can people and tools reach the roof safely and reach the proposed equipment without crossing fragile finishes or blocking a drain? |
This table does not determine a layout. It helps expose questions early, before a sales sketch turns into an expectation.
Check the roof, structure and services together
The US Department of Energy’s homeowner guide identifies roof age, shade, shape and slope as site questions. Use that physical-planning context separately from any Indian approval or incentive rule. Collect records of waterproofing work, repairs, leaks and surface changes. Ask whether the roof needs attention before any future installation and how access for that work would be preserved. A solar professional may need information from the structural and electrical professionals; these are separate checks, not a reason to make a DIY mounting or wiring decision.
Put service coordination on the brief: where equipment could be reached, how a cable route would be reviewed, where electrical equipment might be located, how drainage remains visible, and who is responsible for documenting changes. The final route, fixings, weather protection and electrical arrangement must be reviewed by appropriately qualified professionals for the actual home.
Write a roof brief and verify the current utility process
Illustrative roof brief: “R01 is a flat roof with a stair head at one edge, a tank and pump near the service route, a clothes-drying use, two visible drains and shade that changes during the day. Keep a clear route to the tank and drains. Waterproofing history is to be checked. Proposed solar zone, structural review, electrical equipment location and cable route are open items.” Attach marked photographs, drawings, repair records and your observations.
The official BESCOM SRTPV page currently lists national PM-Surya Ghar and BESCOM application routes, a status link and recent circulars. Start there for the official links, then confirm the process and documents that apply to your actual connection with the utility and responsible project team. Record the page and date checked: portal instructions can change, and a vendor’s earlier application is not proof of your own status.
Keep the brief honest: it describes questions to resolve, not a guaranteed system size, output, saving, approval or installation date.
Take this to your next meeting
Your site checklist
- Mark tanks, stair heads, drains, parapets, drying areas, equipment and the normal access route on a roof plan or photograph.
- Record shade sources and observations at different times; flag trees, neighbouring buildings and possible future changes.
- Collect waterproofing, leak and repair records and ask whether roof work should happen before any future installation.
- Ask a qualified professional to review the actual structure and a qualified electrical professional to coordinate services.
- Reserve an inspectable route to the roof equipment, drains and household services before discussing a final layout.
- Check the current official BESCOM SRTPV page and its application links; confirm requirements for the actual connection.
Common questions
Does a large flat roof guarantee that solar will work there?
No. Shade, roof condition, structure, drainage, access, electrical coordination and the current utility context all need review. A visual estimate of empty roof area is not a suitability assessment.
Should waterproofing be planned before a future solar installation?
Coordinate the question early. If the roof needs repair or waterproofing, ask the relevant professionals how the work and any later equipment interfaces should be sequenced. Do not assume a generic fixing method is suitable for your roof.
Can equipment go anywhere that receives sunlight?
Not necessarily. The selected zone also has to work with shade, structure, drainage, access, maintenance, electrical routing and the applicable utility process. Those decisions belong in a coordinated professional review.
Reading notes
Sources & further reading
Checked on the dates below. Official requirements and documents can change; confirm the version that applies to your site.
- BESCOM SRTPV rooftop solar portal Accessed 20 November 2026
- U.S. Department of Energy: Homeowner’s Guide to Solar Accessed 20 November 2026


